Skip to content

AVA Rocky Mountains How a project runs

The drawings come first.

Before a wall closes, you get the plan: where every piece of hardware and every pre-wire drop will be located, for your review and notes.

Screen Speakers Wi-Fi Keypad Motorized shade, left wall Rack A-1 · Living room · low-voltage plan

A sample sheet. Every project gets its own set.

ConsultationSystem designRough and trimService and support

An installer points at the ceiling of a house under construction while the owners listen

Consultation

The project always begins here, where we listen to our client’s needs and desires. Our preliminary interviews are relaxed yet specific, as we balance what you want with technology trends, budget and built-in obsolescence.

A room under construction with the drawings spread on a table

System design

Our engineering team defines every part of the project. A detailed proposal follows the plans, and an extensive set of drawings shows graphically where all hardware and pre-wire drops will be located. You get them for review and annotation.

Network and speaker cables run through drilled studs to a low-voltage ring

Rough and trim

Support documentation follows the job through the rough and trim phases. With the interior primed, we order the system gear and schedule its installation. These final phases can take a few weeks or a few years, depending on the project’s scale.

An installer shows a homeowner the wall keypad in her finished great room

Service and support

We thoroughly train you in the use of your new system. A complete set of as-built documentation and the programming source code is delivered at final sign-off. With an annual maintenance agreement, the system stays protected and serviced.

Images: design visualizations

Our job is only complete when you are 100% satisfied.

It starts with a relaxed, specific conversation about the house.

NextAbout Esteban

Set up a free consultation

Call EstebanText Esteban

Step 1 of 3

What are you thinking about?